Monday, May 23, 2016

Paris (works)

RATP
The disruptions of Sunday morning on subway line 14 in Paris (France) have ended, as have those that affected the RER A over the past 2 week-ends.

Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:

Next update planned on (or around) May 30th.

Sunday, May 22, 2016

Los Angeles

Los Angeles Metro
A 7 stops extension has opened on the Expo line in Los Angeles (USA), which is now reaching Santa Monica.

Salvador da Bahia

Metrô da Bahia
L. Freund reports the extension of operations (from 5 AM to midnight, every day) on the Metrô de Salvador da Bahia (Brazil).

Fuzhou

Fuzhou metro
A section of the first line of a new metro system has been opened in Fuzhou (China).

Friday, May 20, 2016

Paris (works)

RATP
Station Château-Rouge on subway line 4 in Paris (France) is closed until the end of July.

Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:

Next update planned on (or around) May 22nd.

Tuesday, May 17, 2016

Stuttgart

VVS
A 2 stops extension has recently opened on the U12 Stadtbahn line in Stuttgart (Germany). In addition, works at station Staatsgalerie affect services on lines U1, U2, U4 and U11 until the Summer of 2017.

Paris (works)

RATP
The disruptions of the week-end on subway line 3 in Paris (France) have ended. Next Sunday, there will be no service on line 14 until noon.

Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:

Next update planned on (or around) May 20th.

Sunday, May 15, 2016

Braunschweig

Braunschweiger Verkehrs AG
L. Freund reports important changes on bus lines 418 and 450 in Braunschweig (Germany).

Saturday, May 14, 2016

Paris (works)

Transilien SNCF
The current disruptions between Sartrouville and Cergy/Poissy on the RER A in Paris (France) will be going on for several weeks, while services are also affected by works over this week-end and the next.

Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the "temporary" files here:

Next update planned on (or around) May 17th.

Tuesday, May 10, 2016

Paris (works)

RATP
Subway line 3 in Paris (France) will be replaced by bus services between Gallieni and Gambetta over the coming week-end.

Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:

Next update planned on (or around) May 13th.

Monday, May 09, 2016

Berlin (works)

BVG
Subway line U5 in Berlin (Germany) is replaced by bus services between Strausberger Platz and Alexanderplatz until the end of the month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) May 13th.

Tuesday, May 03, 2016

Seoul

Korail
A new station ("Hyochang Park") has just opened on the Gyeongui-Jungang line in Seoul (Korea).

Bangalore

BMRC
A new section has opened on the purple line of the Bangalore (India) metro, finally joining the two existing separate segments.

Monday, May 02, 2016

Bernlin (works)

BVG
Tram line 61 in Berlin (Germany) is rerouted between Hirschgarten and Friedrichshagen until further notice.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) May 13th.

Paris (works)

RATP
The disruptions of the past week on tram line T1 in Paris (France) have ended, as have the works that were affecting the RER A over the week-end.

Use our online update services (also embedded in most recent versions of MetrO, e.g. for iPhone, Android, BlackBerry, Bada...) or download the « temporary » files here:

Next update planned on (or around) May 10th.