Monday, October 16, 2017

Berlin (works)

BVG
The recent disruptions on subway line U3 and on tram lines M10, 50, 60 and 61 in Berlin (Germany) have now ended. Meanwhile, tram lines M5 and 27 are now replaced by bus services on part of their routes for about a month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 20th.

Saturday, October 14, 2017

Bochum

Bogestra
An extension, comprising 5 new stops, has opened on tram line 302 in Bochum (Germany).

Saturday, October 07, 2017

Stockholm

Storstockholms Lokaltrafik
The Tvärbanan light rail line in Stockholm (Sweden) has been extended to the Sickla railway station.

Paris (works)

Transilien SNCF
The late evening works on the RER B in Paris (France) have now ended, for the time being.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 30th, at the latest.

Kochi

Kochi Metro Rail
A 5 stations extension has just opened on the metro line in Kochi (India).

Wednesday, October 04, 2017

Paris (works)

RATP
Subway station Trinité d'Estienne d'Orves (line 12) in Paris (France) is closed for about 2 months.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 7th.

Tuesday, October 03, 2017

Berlin (works)

BVG
Subway line U9 in Berlin (Germany) runs shuttle services between Güntzelstraße and Zoologischer Garten on Sunday to Thrusday evenings until the end of the month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 16th, at the latest.

Saturday, September 30, 2017

Berlin (works)

BVG
Tram line 50 in Berlin (Germany) is replaced by bus services between Pankow Kirche and Guyotstraße for about 2 weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 3rd.

Monday, September 25, 2017

Paris (works)

RATP
The works at subway stations Odéon (line 4) and Glacière (line 6) in Paris (France) have ended.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 4th.

Berlin (works)

BVG
Subway line U3 in Berlin (Germany) is replaced by bus services between Breitenbachplatz and Krumme Lanke for about 3 weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 16th, at the latest.

Saturday, September 23, 2017

Paris (works)

Transilien SNCF
The RER B in Paris (France) will be replaced by bus services between Aulnay and Roissy-Charles de Gaulle after 23:00 from Monday to Friday over the 2 coming weeks.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 25th.

Monday, September 18, 2017

Berlin (works)

BVG
The works between Grenzallee and Britz-Süd on subway line U7 in Berlin (Germany) have ended last night, while new minor disruptions now affect services at stations Blissestraße and Parchimer Allee.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 25th.

Antwerpen

De Lijn
A new ramp has opened between Zegel and Hof ter Lo on tram line 10 in Antwerpen (Belgium).

Paris (works)

RATP
The disruptions of the week-end on subway line 10 in Paris (France) have now ended. Station Odéon will be closed on line 4 after 22:00 from Friday to Sunday.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 25th.

Saturday, September 16, 2017

Berlin (works)

BVG
Tram line M2 in Berlin (Germany) will be replaced by bus services on part of its route on Sunday to Thursday evenings during about a month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 18th.

Salvador

Metrô da Bahia
A new extension has opened toward the airport on line 2 of the Metrô de Salvador da Bahia (Brazil).

Tuesday, September 12, 2017

Berlin (works)

BVG
The disruptions of the week-end on tram line M2 in Berlin (Germany) have ended last night.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 15th.

Monday, September 11, 2017

Paris (works)

RATP
The works of the past week at station St Placide in Paris (France) have now ended. Subway line 10 will be replaced by bus services between Duroc and Boulogne over the coming week-end.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 18th.

Saturday, September 09, 2017

Lucknow

Lucknow Metro Rail Corporation
Part of the first line of a new metro system has been inaugurated in Lucknow (India).

Paris (works)

Transilien SNCF
The weekday evening works on the RER A and B in Paris (France) have ended last night.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 11th.

Chengdu

Chengdu Metro
A new metro line (10) has just opened in Chengdu (China).

São Paulo

Metrô de São Paulo
An extension, comprising 3 new stations, has recently opened on Metrô line 5 in São Paulo (Brazil).

Wednesday, September 06, 2017

Paris (works)

RATP
The recent works at station St Sulpice on subway line 4 in Paris (France) have now ended.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 9th.

Berlin (works)

BVG
Tram line M2 in Berlin (Germany) is rerouted around Alexanderplatz over the coming week-end.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 12th.

Monday, September 04, 2017

Vienna / Wien

Wiener Linien
An extension has been inaugurated this week-end on subway line U1 in Vienna/Wien (Austria).

Please note that, for lack of any help with the changes, the tram and bus network included in our file may be obsolete.

Paris (works)

RATP
Station St Placide on subway line 4 in Paris (France) will be closed from Wednesday to Sunday, while the RER B is replaced by bus services between Aulnay and Roissy-CDG after 23:00 until Friday.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 6th.

Berlin (works)

BVG
The disruptions on subway line U7 in Berlin (Germany) are moving to the section between Yorkstraße and Hermannplatz, while works now affect tram lines M1, M10, M13 and 16 on some parts of their routes.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 6th.

San Francisco

SF Muni
P. Healy reported the opening of the "E" Heritage Streetcar service in San Francisco (USA) along with a few additional updates.

Friday, September 01, 2017

Paris (works)

RATP
The disruptions on subway line 4 in Paris (France) have ended last night, while station Pyrénées (on line 11) has reopened this morning.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 4th.

Berlin (works)

BVG
The works on subway line U6 in Berlin (Germany) have ended last night.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 4th.

Kunming

Kunming Rail Transit
A new rail transit line has just opened in Kunming (China).

Monday, August 28, 2017

Paris (works)

RATP
With the end of the Summer holidays, the major disruptions on the RER A in Paris (France) have come to an end last night. Meanwhile, station Réaumur-Sébastopol is closed on subway line 4 for about 3 months.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 1st.

Friday, August 25, 2017

Berlin (works)

BVG
New disruptions now affect subway line U7 in Berlin (Germany).

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 1st.

Shiraz

Shiraz Metro
Another extension has opened on the subway line of Shiraz (Iran).

Monday, August 21, 2017

Berlin (works)

BVG
Subway line U6 in Berlin (Germany) will suffer various disruptions in the coming weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) August 25th.

Sunday, August 20, 2017

Nanchang

Nanchang Metro
The second line of the metro network in Nanchang (China) has opened.

Saturday, August 19, 2017

Berlin (works)

BVG
The recent disruptions on subway line U7 at Karl-Marx-Straße and on tram line M10 in Berlin (Germany) have ended.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) August 21st.

Monday, August 14, 2017

Tehran

Metro Tehran
A new metro line (8) now reaches the Imam Khomeini International Airport in Tehran (Iran).

Paris (works)

Transilien SNCF
The works of the week-end on the RER A and B in Paris (France) have now ended.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) August 16th.

Friday, August 11, 2017

Bangkok

MRTA Bangkok
The extension of the blue metro line in Bangkok (Thailand) to Tao Poon finally makes the connection with the purple line.

Berlin (works)

BVG
The recent disruptions on subway line U7 and on tram lines M4, M13 and 12 in Berlin (Germany) have ended this morning. Subway line U6 is now replaced by bus services between Tempelhof and Alt-Mariendorf for a few days.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) August 19th.

Monday, August 07, 2017

Paris (works)

Transilien SNCF
Over the coming week-end, the RER B in Paris (France) will be replaced by bus services between Gare du Nord and Aulnay.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) August 14th.

Saturday, August 05, 2017

Antwerpen

De Lijn
An extension has opened on tram line 7 in Antwerpen (Belgium).

Tuesday, August 01, 2017

Paris (works)

RATP
Station Château Rouge (on subway line 4) in Paris (France) re-opens this morning, while Pyrénées (on line 11) si being closed until the end of August.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) August 7th.

Monday, July 31, 2017

Berlin (works)

BVG
Various disruptions affect tram lines M4, M10, M13 and 12 in Berlin (Germany) for a few days.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) August 11th, at the latest.

Saturday, July 29, 2017

Berlin (works)

BVG
The disruptions on subway line U1 in Berlin (Germany) have just ended. Subway line U7 will operate shuttle services between Richard-Wagner-Platz and Fehrbelliner Platz on Sunday to Thursday evenings during the next 2 weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) July 31st.

Paris (works)

Transilien SNCF
The Summer works on the RER A in Paris (France) begin today with services suspended between Nation and La Défense as well as between Maisons-Laffitte and Poissy until the end of August. In addition, services between Sartrouville and Cergy are operated by bus shuttles on week-ends and on weekday evenings.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) August 1st.

Monday, July 24, 2017

Paris (works)

Transilien SNCF
The RER A in Paris (France) will not run between Sartrouville and Cergy/Poissy over the coming week-end.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) July 29th.

Berlin (works)

BVG
Tram line M10 in Berlin (Germany) will be replaced by bus services between Kniprodestraße/Danziger Straße and Prenzlauer Allee/Danziger Straße over the coming week-end.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) July 29th.

Saturday, July 22, 2017

Paris (works)

Transilien SNCF
The weekday evening disruptions on the RER B in Paris (France) have ended last night. Next week, on late evenings, the RER A will be replaced by bus services between Sartrouville and Cergy.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) July 24th.