Sunday, December 10, 2017

Qindao

Qindao Metro
A second metro line is entering today in experimental operation in Qindao (China).

Stuttgart

VVS
Important changes affect the Stadtbahn network in Stuttgart (Germany), including the opening of new sections on line U12 and changes to the disruptions due to the ongoing works at station Staatsgalerie.

Potsdam

Stadtwerke Potsdam
L. Freund reports the opening of an extension on tram line 96 in Potsdam (Germany).

Berlin

BVG
O. Spauka reports important changes on the S-Bahn network in Berlin (Germany), entering in service today.

Chengdu

Chengdu Metro
A new circular metro line (7) has opened this week in Chengdu (China).

Nanjing

Nanjing Metro
A new suburban line (S3) has opened this week in Nanjing (China).

Saturday, December 09, 2017

Berlin (works)

BVG
The recent disruptions on tram lines M8, 18 and 37 in Berlin (Germany) have now ended.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) December 15th.

Friday, December 01, 2017

Paris (works)

RATP
Station Trinité d'Estienne d'Orves on subway line 12 in Paris (France) has reopened today.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) January 9th, at the latest.

Berlin (works)

BVG
The works of the weekday evenings on subway lines U2 and U7 in Berlin (Germany) have ended last night.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) December 9th.

Tuesday, November 28, 2017

Hannover

GVH
L. Freund reported a change on Stadtbahn lines U10 and U17 in Hannover (Germany): they now reach the railway station.

Berlin (works)

BVG
Some of the disruptions on subway line U7 in Berlin (Germany) have ended. Tram lines M8 and 18 are replaced by bus services on part of their routes for a few days.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) December 1st.

Monday, November 27, 2017

Paris (works)

RATP
Today, on subway line 4 in Paris (France), station Réaumur-Sébastopol is re-opening while station Châtelet is now closed for a few weeks.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) December 1st.

Hyderabad

Hyderabad Metro Rail
The first two lines of a new metro system are inaugurated today in Hyderabad (India).

Saturday, November 25, 2017

Paris (works)

Transilien SNCF
The works of the past week on the RER B in Paris (France) have ended last night.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 27th.

Sunday, November 19, 2017

Paris (works)

RATP
Today's disruptions on subway line 14 in Paris (France) have ended and services are now fully operational.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 25th.

Saturday, November 18, 2017

Helsinki

HSL (Helsinki Region Transport)
A new 14 km extension is being inaugurated today on the metro of Helsinki (Finland).

Paris (works)

Transilien SNCF
The RER B in Paris (France) will be replaced by bus services between Aulnay and Roissy-Charles de Gaulle after 23:00 from Monday to Friday over the coming week.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 19th.

Friday, November 17, 2017

Berlin (works)

BVG
The recent works on tram lines M5 and 27 in Berlin (Germany) have ended.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) November 27th, at the latest.

Lausanne

T-L
P. Schweizer reports a minor change on the bus network in Lausanne (Switzerland).

Monday, November 13, 2017

Paris (works)

RATP
The service interruption of the week-end on subway line 3bis in Paris (France) have ended. Next Sunday, subway line 14 will not run between St Lazare and Madeleine until 17:00.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 19th.

Berlin (works)

BVG
Subway line U7 in Berlin (Germany) is replaced by bus services between Grenzallee and Britz-Süd for 2 weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) November 17th.

Saturday, November 11, 2017

Paris (works)

Transilien SNCF
The weekday evening works on the RER A in Paris (France) have now ended.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 13th.

Berlin (works)

BVG
Recent disruptions on tram lines M13 and 16 in Berlin (Germany) have ended last night. Subway line U8 runs shuttle services on Sunday to Thursday nights between Hermannplatz and Hermannstraße until the end of the month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) November 13th.

Monday, November 06, 2017

Paris (works)

RATP
The disruption of the past few days on the Orlyval and the RER B in Paris (France) have ended, while services on subway line 3bis will be suspended over the end of this week.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 13th.

Berlin (works)

BVG
Subway line U7  in Berlin (Germany) runs shuttle services between Parchimer Allee and Parchimer Allee on weekday evenings until the end of the month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) November 11th.

Thursday, November 02, 2017

Santiago de Chile

Metro de SantiagoA new metro line (6) is inaugurated today in Santiago de Chile (Chile).

Monday, October 30, 2017

Paris (works)

RATP
The Orlyval (the light rail line to the Orly airport) in Paris (France) will be replaced by bus services from Wednesday to Saturday and no RER B will run between Laplace and Bourg-La-Reine from Wednesday to Sunday.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) November 6th.

Saturday, October 28, 2017

Paris (works)

RATP
Tomorrow (October 29th) morning, no service will run on subway line 14 in Paris (France).

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 30th.

Friday, October 27, 2017

Berlin (works)

BVG
The works on subway lines U7 (at station Blissestraße) and U9 in Berlin (Germany) have ended last night.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) November 11th, at the latest.

Saturday, October 21, 2017

Singapore

SBS Transit
A 20 km extension has just opened on the Downtown line (DTL) in Singapore.

Tbilisi

Tbilisi Transport Company
A new station has opened on the Saburtalo metro line in Tbilisi (Georgia).

Paris (works)

Transilien SNCF
The RER A in Paris (France) will not run between Sartrouville and Cergy/Poissy on weekday evenings over the coming 3 weeks (except on 25/10, 30/10 and 31/10).

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 30th.

Monday, October 16, 2017

Berlin (works)

BVG
The recent disruptions on subway line U3 and on tram lines M10, 50, 60 and 61 in Berlin (Germany) have now ended. Meanwhile, tram lines M5 and 27 are now replaced by bus services on part of their routes for about a month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 20th.

Saturday, October 14, 2017

Bochum

Bogestra
An extension, comprising 5 new stops, has opened on tram line 302 in Bochum (Germany).

Saturday, October 07, 2017

Stockholm

Storstockholms Lokaltrafik
The Tvärbanan light rail line in Stockholm (Sweden) has been extended to the Sickla railway station.

Paris (works)

Transilien SNCF
The late evening works on the RER B in Paris (France) have now ended, for the time being.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 30th, at the latest.

Kochi

Kochi Metro Rail
A 5 stations extension has just opened on the metro line in Kochi (India).

Wednesday, October 04, 2017

Paris (works)

RATP
Subway station Trinité d'Estienne d'Orves (line 12) in Paris (France) is closed for about 2 months.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 7th.

Tuesday, October 03, 2017

Berlin (works)

BVG
Subway line U9 in ;Berlin (Germany) runs shuttle services between Güntzelstraße and Zoologischer Garten on Sunday to Thrusday evenings until the end of the month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 16th, at the latest.

Saturday, September 30, 2017

Berlin (works)

BVG
Tram line 50 in Berlin (Germany) is replaced by bus services between Pankow Kirche and Guyotstraße for about 2 weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 3rd.

Monday, September 25, 2017

Paris (works)

RATP
The works at subway stations Odéon (line 4) and Glacière (line 6) in Paris (France) have ended.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) October 4th.

Berlin (works)

BVG
Subway line U3 in Berlin (Germany) is replaced by bus services between Breitenbachplatz and Krumme Lanke for about 3 weeks.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) October 16th, at the latest.

Saturday, September 23, 2017

Paris (works)

Transilien SNCF
The RER B in Paris (France) will be replaced by bus services between Aulnay and Roissy-Charles de Gaulle after 23:00 from Monday to Friday over the 2 coming weeks.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 25th.

Monday, September 18, 2017

Berlin (works)

BVG
The works between Grenzallee and Britz-Süd on subway line U7 in Berlin (Germany) have ended last night, while new minor disruptions now affect services at stations Blissestraße and Parchimer Allee.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 25th.

Antwerpen

De Lijn
A new ramp has opened between Zegel and Hof ter Lo on tram line 10 in Antwerpen (Belgium).

Paris (works)

RATP
The disruptions of the week-end on subway line 10 in Paris (France) have now ended. Station Odéon will be closed on line 4 after 22:00 from Friday to Sunday.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 25th.

Saturday, September 16, 2017

Berlin (works)

BVG
Tram line M2 in Berlin (Germany) will be replaced by bus services on part of its route on Sunday to Thursday evenings during about a month.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 18th.

Salvador

Metrô da Bahia
A new extension has opened toward the airport on line 2 of the Metrô de Salvador da Bahia (Brazil).

Tuesday, September 12, 2017

Berlin (works)

BVG
The disruptions of the week-end on tram line M2 in Berlin (Germany) have ended last night.

Download our newest "works" database here or with our online update services or with the equivalent feature embedded in recent versions of the MetrO app (for iPhone, Android, Bada, Blackberry...).

Next update on (or around) September 15th.

Monday, September 11, 2017

Paris (works)

RATP
The works of the past week at station St Placide in Paris (France) have now ended. Subway line 10 will be replaced by bus services between Duroc and Boulogne over the coming week-end.

Use our online update services (also embedded in most versions of MetrO, e.g. for iPhone) or download the "temporary" files here:
Next update planned on (or around) September 18th.